FORT PIERRE, S.D.(KCCR)- The Fort Pierre City Council has approved moving forward with a study of the city’s electrical system to determine needs for the growing city. Public Works Director Rick Hahn says the proposal from D-G-R Engineering is in two tasks.
Task two includes addressing the city’s generation station and possible upgrades to the facility.
Andy Koob with D-G-R says study will show Fort Pierre what it needs to make sure power is available in the future.
Koob says the study will help find deficiencies in Fort Pierre’s system and develop a solutions for addressing them.